Accomplishments

Pie-IX Blvd. BRT Project

Customer

Aecom

Challenge

Design a network infrastructure on which resides the BRT (Bus Rapid Transit) integrated project

Solution

Resologi developed telecommunication networks for stations and thoroughfares to ensure 99.9% system availability for all the equipment. The networks support equipment installed in stations and on the Pie-IX Blvd. BRT corridor including information displays, security cameras, people and vehicle counters, routers and switches, ticket machines, validators, public announcement speakers, emergency signalling, etc

Cat